• 贸易战打败的是经济理论家,不是中美两国经济。 2019-05-13
  • 西部网(陕西新闻网)www.cnwest.com 2019-05-12
  • 高考表情:考前一刻不放松【高清组图】【6】 2019-05-11
  • 山西积极推进农业生产“保姆式”“套餐式”服务 2019-05-11
  • 逛博物馆 淳化大鼎的身世之谜:是何方显贵之物? 2019-05-10
  • 东部战区空军着力培养基层学习贯彻带头人 2019-05-09
  • 新华网评:凝聚打赢脱贫攻坚战的强大合力 2019-05-09
  • 清新 —频道 春城壹网 七彩云南 一网天下 2019-05-08
  • 5月一二三线城市房价环比都涨了,楼市未来会怎样? ——凤凰网房产上海 2019-05-07
  • 到户就不是计划经济,统一经营坚持集体的是计划经济。 2019-05-06
  • 全世界球迷进入“世界杯时间”,足球与美酒一同为世界带来快乐世界杯 中国 2019-05-06
  • 第十届全国既有建筑改造大会在京召开 2019-05-05
  • 杭州“拥江发展”20个备选LOGO 你最心仪哪一个?——浙江在线 2019-05-05
  • 贯彻乡村振兴战略 推进城乡融合发展 2019-05-04
  • 社区 —频道 春城壹网 七彩云南 一网天下 2019-05-03
  • Quality inspection

    TEC Mold is strongly committed to quality, accredited to ISO 9001:2008 and ISO/TS 16949:2009 since 2011. Implementing dedicated Quality Departments for each one of the divisions assuring compliance to the quality procedures in place.

    Main QC Procedures for Mold:

    1. Incoming Inspection:

    Includes steel hardness and full inspections on steels, mold base and components.

    2. In-Process Inspection:

    Electrode inspection, cavity, core& inserts inspection, pre-assembly inspection, mold trial report and samples inspection.

    3. Final Inspection Control:

    Includes pre-shipment inspections on mold and packing that includes, steel certificates, 2D and 3D mold design and mold trial video. The list of quality documents that are generated includes: Mold Base Inspection Report, Steel Inspection Report, Electrode Inspection Report, Heat Treatment Report, IQC Report, IPQC Report, Sample Inspection Report and Pre Shipment QA Report.


    HEXAGON CMM Machine


    HEXAGON CMM Machine

    Main QC Procedures for Production:

    1. Supplier audit procedures
    2 .Product identification
    3. Incoming material inspection procedures
    4. Inspection procedures for the production process,
    5. Final inspection procedures
    6. Inspection and test status of the control procedures,
    7. Nonconforming product control procedure
    8. Corrective and preventive measures control procedures
    9. Customer complaint control procedure
    10. Producing ISIRs using our CMMs, providing a full CPK, FAI PPAP, PFMEA documentation.

    Mold maintance:

    In order to protect customer′s deposited mold in our factory, we have assigned the specialists to carry out the regular maintenance of the mold at our appointed site.

    1. Daily maintenance: Molds are checked & maintained by in-charge technician once per 12 hours. Keep record on the daily report.

    2. Periodical maintenance:
    50T~100T: Maintain mold once per 60000 shot part which mould is running for
    150T~160T: Maintain mold once per 50000 shot part which mould is running for
    220T~350T: Maintain mold once per 40000 shot part which mould is running for
    468~800T:Maintain mold once per 20000 shot part which mould is running for
    1300~2400T:Maintain mold once per 10000 shot part which mould is running for
    3600T:Maintain mold once per 10000 shot part which mould is running for

    3. Appearance Maintenance: Apply spray grease to outside of mold to prevent rusting. Spray anti-rust (moisture guard) to all moulding surfaces prior to mold being removed from injection moulding machine. Mold will be stored in a suitable environment to ensure good condition. Appearance maintenance will be completed by mold keeper and operator.


  • 贸易战打败的是经济理论家,不是中美两国经济。 2019-05-13
  • 西部网(陕西新闻网)www.cnwest.com 2019-05-12
  • 高考表情:考前一刻不放松【高清组图】【6】 2019-05-11
  • 山西积极推进农业生产“保姆式”“套餐式”服务 2019-05-11
  • 逛博物馆 淳化大鼎的身世之谜:是何方显贵之物? 2019-05-10
  • 东部战区空军着力培养基层学习贯彻带头人 2019-05-09
  • 新华网评:凝聚打赢脱贫攻坚战的强大合力 2019-05-09
  • 清新 —频道 春城壹网 七彩云南 一网天下 2019-05-08
  • 5月一二三线城市房价环比都涨了,楼市未来会怎样? ——凤凰网房产上海 2019-05-07
  • 到户就不是计划经济,统一经营坚持集体的是计划经济。 2019-05-06
  • 全世界球迷进入“世界杯时间”,足球与美酒一同为世界带来快乐世界杯 中国 2019-05-06
  • 第十届全国既有建筑改造大会在京召开 2019-05-05
  • 杭州“拥江发展”20个备选LOGO 你最心仪哪一个?——浙江在线 2019-05-05
  • 贯彻乡村振兴战略 推进城乡融合发展 2019-05-04
  • 社区 —频道 春城壹网 七彩云南 一网天下 2019-05-03